Skip to Contents

View Properties

Title:DOE 1999 Full ATLAS Proposal (pdf)
Summary:Proposal submitted to DOE in April-1999 for UMATLAS
Description:
Keywords:
Handle: Document-65
Owner: Site Administrator (User-2, admin:DocuShare)DS
Create Date:Monday, July 12, 1999 11:39:04 AM EDT
Modified Date:Monday, July 12, 1999 11:39:04 AM EDT
Modified By:
Expiration Date:
Locked By:
Abstract:
  • 22 8?2 Assembly Area Development The tube and chamber assembly area development at Michigan has been great challenge for the group since w are building the largest chambers ?6m long? 27 8?4?1 Chamber Components Chambers consist of 6 tube layers with 64 tubes per layer? As wehave done for the tube gas leakage test, we will develop an e?cientway to test and monitor the chamber gas system? X?ray survey After all the tests are done in the chamber test station, we will ship the chambers to 31 Milestone Date Tub assembly station complete 5?15?99 Chamber assembly station complete 11?15?99 Tub teststationcomplete 6?1?99 Chamber test station complete 12?20?99 Module 0 chamber assembly start 12?...
Add Versions:Allowed
Author:
Content Type: Adobe Portable Document Format (.pdf) - application/pdf
File name:atlas.pdf
Is Placeholder:
Max Versions:4
Size:626997
Ready for Declare:No
Appears In: Pending DOE ATLAS proposal
Preferred Version: DOE 1999 Full ATLAS Proposal (pdf)
Goto Xerox.com