Skip to Contents

View Properties

Title:doe_master_2004_dsl
Summary:
Description:
Keywords:
Handle: Document-2393
Owner: Levin, Daniel (User-14, dslevin:DocuShare)DS
Create Date:Monday, July 19, 2004 06:55:19 AM EDT
Modified Date:Monday, July 19, 2004 06:55:19 AM EDT
Modified By:
Expiration Date:
Locked By:
Abstract:
  • Rail Toroid Assembly Platforms 9 UM ATLAS site review, July 19, 2004 Leak-rate measurement Dark-current measurement Cosmic-ray test Cabling, T-sensors and In-plane system test Chamber Integration and Test Activities in Building 184 10 UM ATLAS site review, July 19, 2004 ATLAS end-cap muon system in H8 test facility The University of Michigan is the leading institute for this system test at H8 (2002-2004) 11 UM ATLAS site review, July 19, 2004 Movie: UM ATLAS Activities at CERN We have a set of movies ...
Add Versions:Allowed
Author:
Content Type: Microsoft Power Point (.ppt, .pot) - application/vnd.ms-powerpoint
File name:Master_doe_2004_dsl.ppt
Is Placeholder:
Max Versions:4
Size:15747072
Ready for Declare:No
Appears In: 2004
Preferred Version: doe_master_2004_dsl
Goto Xerox.com