| Title: | Complete TASK A Presentation |
| Summary: | DoE 2004 ATLAS Presentation |
| Description: | This includes all talks in one file. |
| Keywords: | ATLAS DoE 2004 presentation |
|
Handle:
|
Document-2384
|
|
Owner:
|
McKee, Shawn (User-18, smckee:DocuShare)DS
|
| Create Date: | Thursday, July 15, 2004 01:22:15 PM EDT |
| Modified Date: | Monday, July 19, 2004 12:50:10 PM EDT |
|
Modified By:
|
Goldfarb, Steven (User-20, goldfarb:DocuShare)DS
|
| Expiration Date: | |
|
Locked By:
|
|
| Abstract: | - Rail Toroid Assembly Platforms 9 UM ATLAS site review, July 19, 2004 Leak-rate measurement Dark-current measurement Cosmic-ray test Cabling, T-sensors and In-plane system test Chamber Integration and Test Activities in Building 184 10 UM ATLAS site review, July 19, 2004 ATLAS end-cap muon system in H8 test facility The University of Michigan is the leading institute for this system test at H8 (2002-2004) 11 UM ATLAS site review, July 19, 2004 Movie: UM ATLAS Activities at CERN We have a set of movies ...
|
| Add Versions: | Allowed |
| Author: | |
| Content Type: |
Microsoft Power Point (.ppt, .pot) - application/vnd.ms-powerpoint
|
| File name: | Master_doe_2004.ppt |
| Is Placeholder: | |
| Max Versions: | 4 |
| Size: | 16201728 |
| Ready for Declare: | No |
|
Appears In:
|
2004
|
|
Preferred Version:
|
Complete TASK A Presentation
|