| Title: | DOE Presentation: H8 2003 Test Beam Status |
| Summary: | |
| Description: | |
| Keywords: | |
|
Handle:
|
Document-1902
|
|
Owner:
|
Levin, Daniel (User-14, dslevin:DocuShare)DS
|
| Create Date: | Friday, July 11, 2003 10:52:48 AM EDT |
| Modified Date: | Friday, July 11, 2003 10:57:27 AM EDT |
|
Modified By:
|
Levin, Daniel (User-14, dslevin:DocuShare)DS
|
| Expiration Date: | |
|
Locked By:
|
|
| Abstract: | - Leading roles filled by UM: Electronics End-Cap Chamber coordination 2 End-Cap setup includes: 1) Six fully instrumented chambers: EIS1 & EIL1 from BMC EML2 & EMS 2 from Seattle EOL3 & EOS3 from Russia 2) “Final” Production electronic chain New mezzanine cards with octal AMTs Chamber Service Modules (CSM-1s) MROD readout from multiple CSMs and event building 3) Full alignment and temperature sensing readout 3 H8 End-Cap Chambers Commissioning For this work we christened the Chamber Integration Facility ...
|
| Add Versions: | Allowed |
| Author: | d. levin |
| Content Type: |
Microsoft Power Point (.ppt, .pot) - application/vnd.ms-powerpoint
|
| File name: | DOE_H8_2003.ppt |
| Is Placeholder: | |
| Max Versions: | 4 |
| Size: | 4803072 |
| Ready for Declare: | No |
|
Appears In:
|
ATLAS General
,
ATLAS MDT
,
ATLAS Presentations
,
Dan Levin
,
DoE ATLAS Proposals
|
|
Preferred Version:
|
DOE Presentation: H8 2003 Test Beam Status
|