Skip to Contents

View Properties

Title:DOE Presentation: H8 2003 Test Beam Status
Summary:
Description:
Keywords:
Handle: Document-1902
Owner: Levin, Daniel (User-14, dslevin:DocuShare)DS
Create Date:Friday, July 11, 2003 10:52:48 AM EDT
Modified Date:Friday, July 11, 2003 10:57:27 AM EDT
Modified By: Levin, Daniel (User-14, dslevin:DocuShare)DS
Expiration Date:
Locked By:
Abstract:
  • Leading roles filled by UM: Electronics End-Cap Chamber coordination 2 End-Cap setup includes: 1) Six fully instrumented chambers: EIS1 & EIL1 from BMC EML2 & EMS 2 from Seattle EOL3 & EOS3 from Russia 2) “Final” Production electronic chain New mezzanine cards with octal AMTs Chamber Service Modules (CSM-1s) MROD readout from multiple CSMs and event building 3) Full alignment and temperature sensing readout 3 H8 End-Cap Chambers Commissioning For this work we christened the Chamber Integration Facility ...
Add Versions:Allowed
Author:d. levin
Content Type: Microsoft Power Point (.ppt, .pot) - application/vnd.ms-powerpoint
File name:DOE_H8_2003.ppt
Is Placeholder:
Max Versions:4
Size:4803072
Ready for Declare:No
Appears In: ATLAS General ATLAS MDT ATLAS Presentations Dan Levin DoE ATLAS Proposals
Preferred Version: DOE Presentation: H8 2003 Test Beam Status
Goto Xerox.com