| Title: | ATLAS_DOE_2002 |
| Summary: | ATLAS (Task A) DoE 2002 presentation |
| Description: | |
| Keywords: | ATLAS DoE 2002 |
|
Handle:
|
Document-1648
|
|
Owner:
|
McKee, Shawn (User-18, smckee:DocuShare)DS
|
| Create Date: | Sunday, September 8, 2002 09:12:50 AM EDT |
| Modified Date: | Wednesday, August 13, 2003 06:35:23 PM EDT |
|
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Expiration Date: | |
|
Locked By:
|
|
| Abstract: | - September 9, 2002 ATLAS DoE Site Review 1 UM ATLAS Task A: ATLAS Tech.
- September 9, 2002 ATLAS DoE Site Review 24 UM ATLAS MDT Tube Quality Control Fixtures Tube Leak Detector Dark Current Stand Tube Length & Wire Tension Measurement September 9, 2002 ATLAS DoE Site Review 25 UM ATLAS MDT Chamber Production Michigan chamber production began in Oct.
- 2000, and has now completed 51/80 chambers.
- Rasnik mask OPS Tower September 9, 2002 ATLAS DoE Site Review 30 UM ATLAS Chamber/Tube Handling Fixtures Tube transport box Chamber handling cart September 9, 2002 ATLAS DoE Site Review 31 UM ATLAS Chamber Shipping Chamber shipping box without side panels Loading chamber box into shipping container...
|
| Add Versions: | Allowed |
| Author: | |
| Content Type: |
Microsoft Power Point (.ppt, .pot) - application/vnd.ms-powerpoint
|
| File name: | ATLAS.ppt |
| Is Placeholder: | |
| Max Versions: | 4 |
| Size: | 13227520 |
| Ready for Declare: | No |
|
Appears In:
|
2002
|
|
Preferred Version:
|
ATLAS_DOE_2002
|