1. Ann Arbor, June 1, 2000
  2. Slide 2
  3. Slide 3
  4. Slide 4
  5. Slide 5
  6. Slide 6
  7. Leak Checking
  8. Resistance Measurements: Nov 99
  9. 408 tubes
  10. EM crimp with & without steel spring
  11. Slide 11
  12. Complete report: ATL-COM-MUON-99-038
  13. Slide 13
  14. Slide 14
  15. Slide 15
  16. Dark Current Testing: Conclusion
  17. Slide 17
  18. Slide 18
  19. Tube QA/QC Summary

Ann Arbor, June 1, 2000

Back to top


Slide 2

Back to top


Slide 3

Back to top


Slide 4

Back to top


Slide 5

Back to top


Slide 6

Back to top


Leak Checking

Back to top


Resistance Measurements: Nov 99

Back to top


408 tubes

Back to top


EM crimp with & without steel spring

Back to top


Slide 11

Back to top


Complete report: ATL-COM-MUON-99-038

Back to top


Slide 13

Back to top


Slide 14

Back to top


Slide 15

Back to top


Dark Current Testing: Conclusion

Back to top


Slide 17

Back to top


Slide 18

Back to top


Tube QA/QC Summary

Back to top