T

ube

Productio

n

F

aciliti

e

s

T

ube

Productio

n

F

aciliti

e

s

Room

ent rance

Not Used

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

Temp Storage

400 tube storage

Wiring Table

Leak & EMMI

& Resistance

Movable Rack

Truck Bay

Raw tubes

Rm 2208

R m 2214

800 tube storage

Dark Current

Endplug

Cleaning

Rm 2214

 

Michigan

Wiring

Table

Tube assembly facility ready;

debugged by making 400 module 0

tubes.

Computer?control/automatic dat

a logging for most operations.

Two wiring platforms (one mova

ble).

Ele ctromagnetic endplug swagin

g.

Automated wiring tensioning wi

th linear actuator.

Tube assembly time: 2 people f

or 8 minutes

UM?developed production DB wit

h web interface.

Michigan Wiring Room Michigan W

iring Room

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

Wiring Program

 

Dust meter

 

 

Temperature cont rolled to 19.5

0.5 û C.

Controlled access ? entry thro

ugh side room where clean room

garb is donned.

Overpressure of 1% is maintain

ed.

Clean room class 100,000?200,0

00. We have a dust meter to mo

nitor class.

Class is difficul

t to change ? room is tied to b

uilding air supply and out of o

ur

contr ol. Adding filters to

room ducts woul d disrupt air fl

ow.

Wiring Room Specifications Wiri

ng Room Specifications

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

 

Movable Platform Movable Platfo

rm

Vacuum

Chuck

EM

Swager

Coil

Pressure

backed

Endplug

holder

Pn eumatic

Controls

Wire

Spoo l

Wire

Clamp

Wir e

Crimper

Linear

Ra il

 

 

F ixed & moving platforms alig

ned to < 1 00 m m.

Vacuum chuck linear bored wit

h end plug

holder aligned t

o < 10m m.

Platform position accurate to

< 25 m m.

Instructions

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

Alignment

check

 

Fixed Platform Fixed Platform

Vacuum

Chuck

EM

Swager

Coil

Pressure

backed

endplug

holder

Pn eumatic

Controls

Wire

Tens ioner

Wire

Crimper

W ire

tension

meter

Wir e tension meter calibrated

daily.

Tension set via computer with

feedback from tension meter.

Precision 1 g.

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

 

EM Swager/Wire Puller EM Swager

/Wire Puller

Electromagnetic

Swager

Control B

ox

Vacuum Sucker

Wire holder

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

 

Us ed "bubbly" Protvino endplug

s. Added chamfers of either

0.

4 or 0.7 chamfer.

Endplugs surve

yed with micrometer & go/nogo g

auges: 12

failed.

E ndplug with t

wister surveyed with opti cal me

thod (image

twister hole on CCD

): none fail.

Diameter

survey

Twister

s urvey

Diameter

survey

Tw ister

survey

Pre?Production endplug tests Pr

e?Production endplug tests

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

 

Edward Diehl

AT

LAS UM Site Review June 1, 200

0

Run wiring program on computer

. Program records various

para

mete rs: wire spool, operator na

mes, humidi ty and swaging HV

fo

r DB file.

Scan tube bar code; computer m

oves wiring stage to proper tub

e

length .

Put tube in vacuum chucks. In

sert endplugs in holders.

Pull wire through tube with va

cuum; thread wire into endplugs

.

Insert endplugs into tube. Cri

mp one wire at one end.

Swage endplugs to tube with E M

coil.

Pretension wire; set wire tens

ion, crimp other end of wire.

Place in adjacent v?channel an

d measure tube length and wire

tension.

Write DB file entry for tube.

T

ube Wi

ring Pr

oc

ed

u

r

e

T

ube Wi

ring Pr

oc

ed

u

r

e

Back to top