Gas System Traveler (page 1) Sector: EMLC05
    Initials
    Date, Time
    1
    Corrected BVBs Installed
    Hertel
    Comments:
    2
    Flow Restrictors Installed
    Comments:
    3
    Reducers and Master
    Shutoff Valves Installed
    Hertel
    April 21
    st
    Comments:
    4
    Connected to Leak Test
    Station & Gas Supply
    Hertel
    April 21
    st
    Comments:
    5
    Tightness of Manifold
    Valves Inspected
    Hertel
    April 21
    st
    Comments:
    6
    Chamber Pressure
    Measurement
    Hertel
    April 21
    st
    (psi)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    21.86
    21.95
    26.13
    25.68
    25.14
    ML2
    22.58
    24.34
    24.8
    26.36
    26.53
    Comments:
    In gauge pressure, as measured by dave’s
    pressure sensore
    7
    Pressurized to 3 bar
    Hertel
    April 21
    st
    Comments:

    Gas System Traveler (page 2) Sector:EMLC05
    Initials
    Date, Time
    8
    Overnight dP/dt
    Measurement
    Hertel
    April 24-May 12
    Duration (hr)
    P (psi)
    P (mbar)
    [psi×68.97]
    dP/dt
    (mbar/day)
    ML1
    18 Days
    -0.08
    -5.52
    ~0
    ML2
    -0.15
    -10.4
    -0.6
    Comments:
    These measurements were taken
    with a gauge pressure
    pressure gauge
    9
    Gas Flush
    Hertel
    April 24
    th
    Flow Rate (sl/m):
    9.03
    Start Date, Time
    April 21
    st, 20:00
    End Date, Time
    April 24
    th, 9:15
    Total Gas Volume
    Flowed (sl)
    33050
    Number of Volume
    Exchanges
    2.5
    Comments:

    High Voltage Traveler (page 1) Sector: EMLC05
    Initials
    Date, Time
    1
    Connect Sector
    HV Cables to
    Chambers
    Hertel
    April 26
    Comments
    2
    Attatch Sector to
    CAEN Supply
    Hertel
    April 26
    Comments
    3
    Power-Up to 3080 V
    Hertel
    April 26
    (
    μ
    A)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    0.1
    0.1
    0
    0
    0
    ML2
    0
    0.1
    0
    0
    0.1
    Humidity
    Comments
    4
    Short DAQ Test
    Tiesheng
    April 26
    Comments
    (including any
    dead channels)

    High Voltage Traveler (page 2) Sector: EMLC05
    Initials
    Date, Time
    5
    3200 V 3 Hours
    Hertel
    April 26
    (
    μ
    A)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    0.3
    0.1
    0
    0
    0.1
    ML2
    0
    0.2
    0.3
    0
    0
    Humidity
    Comments
    When changing voltage to 3200V, ML1,
    chamber 2 was accidentally set to 32V. The
    HV system registered a trip while ramping
    down. The multilayer went up to 3200V with
    no problem, and the trip was unreproducable.
    6
    3080 V > 1 Day
    Hertel
    April 26
    (
    μ
    A)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    ML2
    Humidity
    Comments
    8
    Start Long-Term DAQ
    Tiesheng
    April 26th

    Long-Term Pressure Traveler Sector: EML-C05
    Start
    Stop
    Initials
    Date
    Pressure
    (psi)
    Initials
    Date
    Pressure
    (psi)
    ML1
    Hertel
    May 15
    45.62
    ML2
    45.34
    Number of Days
    Pressure Change (psi)
    Pressure Change (mbar) [psi×68.97]
    Rate (mbar/day)
    Comments

    Tension Rod Traveler Sector: EML-C05
    Initials
    Date, Time
    1
    Original Measurement,
    Before Tuning
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments
    2
    Stability Check, Days or
    Weeks Later
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments
    3
    Freshly Tuned Values
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments
    4
    Second Stability Check
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments

    Back to top