Gas System Traveler (page 1) Sector: EMLC01
Initials
Date, Time
1
Corrected BVBs Installed
Hertel
May 15, 2006
Comments:
2
Flow Restrictors Installed
Hertel
May 15, 2006
Comments:
3
Reducers and Master
Shutoff Valves Installed
Hertel
May 15, 2006
Comments:
4
Connected to Leak Test
Station & Gas Supply
Hertel
May 15, 2006
Comments:
5
Tightness of Manifold
Valves Inspected
Hertel
May 15, 2006
Comments:
6
Chamber Pressure
Measurement
Hertel
May 15, 2006
(psi)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
ML1
33.79
35.90
39.86
36.89
41.72
ML2
35.11
38.09
39.58
40.20
41.35
Comments:
7
Pressurized to 3 bar
Hertel
May 15, 2006
Comments:
Gas System Traveler (page 2) Sector: EMLC01
Initials
Date, Time
8
Overnight dP/dt
Measurement
Hertel
May 17 – June 7
Duration (hr)
∆
P (psi)
∆
P (mbar)
[psi×68.97]
dP/dt
(mbar/day)
ML1
21 days
> +1.50
+104
+5
ML2
> +1.32
+91.1
+4
Comments:
On June 7, both P-sensors were
maxed out at 46.33 psi.
∆
T=5K.
Starting P = 44.83 (ml1) 45.01 (ml2)
9
Gas Flush
Hertel
May 15-17
Flow Rate (sl/m):
9.03
Start Date, Time
May 15, 17:00
End Date, Time
May 17, 14:00
Total Gas Volume
Flowed (sl)
18963
Number of Volume
Exchanges
1.88
Comments:
High Voltage Traveler (page 1) Sector: EMLC01
Initials
Date, Time
1
Connect Sector
HV Cables to
Chambers
Hertel
May 15, 2006
Comments
2
Attatch Sector to
CAEN Supply
Hertel
May 15, 2006
Comments
3
Power-Up to 3080 V
Hertel
May 17, 2006
(
μ
A)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
ML1
0.4
0.2
0.0
0.0
0.2
ML2
0.0
0.1
0.4
0.0
0.1
Humidity
Comments
4
Short DAQ Test
Comments
(including any
dead channels)
High Voltage Traveler (page 2) Sector: EMLC01
Initials
Date, Time
5
3200 V 3 Hours
Hertel
May 17 14:15-17:15
(
μ
A)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
ML1
0.3
0.4
0.0
0.0
0.2
ML2
0.0
0.1
0.3
0.0
0.2
Humidity
Comments
6
3080 V > 1 Day
Hertel
May 17, 17:15
(
μ
A)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
ML1
Good
Good
Good
Good
Good
ML2
Good
Good
Good
Good
Good
Humidity
Comments
8
Start Long-Term DAQ
Long-Term Pressure Traveler Sector: EMLC01
Start
Stop
Initials
Date
Pressure
(psi)
Initials
Date
Pressure
(psi)
ML1
Hertel
June 7
>46.33
ML2
>46.33
Number of Days
Pressure Change (psi)
Pressure Change (mbar) [psi×68.97]
Rate (mbar/day)
Comments
Both multilayers were maxed out at 46.33 psi on June
7
th, and I forgot to release enough pressure to get a
good measurement, so this is the closest we have to a
starting pressure we have right now.
-hertel
Tension Rod Traveler Sector: EMLC01
Initials
Date, Time
1
Original Measurement,
Before Tuning
(
μ
m)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
Short
Long
Comments
2
Stability Check, Days or
Weeks Later
(
μ
m)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
Short
Long
Comments
3
Freshly Tuned Values
(
μ
m)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
Short
Long
Comments
4
Second Stability Check
(
μ
m)
Chamber
1
Chamber
2
Chamber
3
Chamber
4
Chamber
5
Short
Long
Comments