Gas System Traveler (page 1) Sector: EMLC01
    Initials
    Date, Time
    1
    Corrected BVBs Installed
    Hertel
    May 15, 2006
    Comments:
    2
    Flow Restrictors Installed
    Hertel
    May 15, 2006
    Comments:
    3
    Reducers and Master
    Shutoff Valves Installed
    Hertel
    May 15, 2006
    Comments:
    4
    Connected to Leak Test
    Station & Gas Supply
    Hertel
    May 15, 2006
    Comments:
    5
    Tightness of Manifold
    Valves Inspected
    Hertel
    May 15, 2006
    Comments:
    6
    Chamber Pressure
    Measurement
    Hertel
    May 15, 2006
    (psi)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    33.79
    35.90
    39.86
    36.89
    41.72
    ML2
    35.11
    38.09
    39.58
    40.20
    41.35
    Comments:
    7
    Pressurized to 3 bar
    Hertel
    May 15, 2006
    Comments:

    Gas System Traveler (page 2) Sector: EMLC01
    Initials
    Date, Time
    8
    Overnight dP/dt
    Measurement
    Hertel
    May 17 – June 7
    Duration (hr)
    P (psi)
    P (mbar)
    [psi×68.97]
    dP/dt
    (mbar/day)
    ML1
    21 days
    > +1.50
    +104
    +5
    ML2
    > +1.32
    +91.1
    +4
    Comments:
    On June 7, both P-sensors were
    maxed out at 46.33 psi.
    T=5K.
    Starting P = 44.83 (ml1) 45.01 (ml2)
    9
    Gas Flush
    Hertel
    May 15-17
    Flow Rate (sl/m):
    9.03
    Start Date, Time
    May 15, 17:00
    End Date, Time
    May 17, 14:00
    Total Gas Volume
    Flowed (sl)
    18963
    Number of Volume
    Exchanges
    1.88
    Comments:

    High Voltage Traveler (page 1) Sector: EMLC01
    Initials
    Date, Time
    1
    Connect Sector
    HV Cables to
    Chambers
    Hertel
    May 15, 2006
    Comments
    2
    Attatch Sector to
    CAEN Supply
    Hertel
    May 15, 2006
    Comments
    3
    Power-Up to 3080 V
    Hertel
    May 17, 2006
    (
    μ
    A)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    0.4
    0.2
    0.0
    0.0
    0.2
    ML2
    0.0
    0.1
    0.4
    0.0
    0.1
    Humidity
    Comments
    4
    Short DAQ Test
    Comments
    (including any
    dead channels)

    High Voltage Traveler (page 2) Sector: EMLC01
    Initials
    Date, Time
    5
    3200 V 3 Hours
    Hertel
    May 17 14:15-17:15
    (
    μ
    A)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    0.3
    0.4
    0.0
    0.0
    0.2
    ML2
    0.0
    0.1
    0.3
    0.0
    0.2
    Humidity
    Comments
    6
    3080 V > 1 Day
    Hertel
    May 17, 17:15
    (
    μ
    A)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    ML1
    Good
    Good
    Good
    Good
    Good
    ML2
    Good
    Good
    Good
    Good
    Good
    Humidity
    Comments
    8
    Start Long-Term DAQ

    Long-Term Pressure Traveler Sector: EMLC01
    Start
    Stop
    Initials
    Date
    Pressure
    (psi)
    Initials
    Date
    Pressure
    (psi)
    ML1
    Hertel
    June 7
    >46.33
    ML2
    >46.33
    Number of Days
    Pressure Change (psi)
    Pressure Change (mbar) [psi×68.97]
    Rate (mbar/day)
    Comments
    Both multilayers were maxed out at 46.33 psi on June
    7
    th, and I forgot to release enough pressure to get a
    good measurement, so this is the closest we have to a
    starting pressure we have right now.
    -hertel

    Tension Rod Traveler Sector: EMLC01
    Initials
    Date, Time
    1
    Original Measurement,
    Before Tuning
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments
    2
    Stability Check, Days or
    Weeks Later
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments
    3
    Freshly Tuned Values
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments
    4
    Second Stability Check
    (
    μ
    m)
    Chamber
    1
    Chamber
    2
    Chamber
    3
    Chamber
    4
    Chamber
    5
    Short
    Long
    Comments