1. EMLC09
  2. EMLC11
  3. EMLC07
  4. EMLC13
  5. EMLC03
  6. EMLC05
  7. EMLC01
  8. EMLC15
  9. EMSC04
  10. EMSC02
  11. EMSC16
  12. EMSC14
  13. EMSC06
  14. EMSC08
  15. EMSC10
  16. EMSC12
  17. TEMPLATE 1

  A B C D E F G H I J K L M N
1                              
2                              
3 Newer BVBs Installed NOT DONE ('top' two)                        
4 Flow Restrictors Installed                            
5 Reducers & Master Shutoff Valves Installed                            
6 Connected to Leak Test Station & Gas Supply                            
7 Tightness of BVB Valves Inspected                            
8                              
9 Chamber Pressure Measurement                            
10                              
11                   elapsed time T start T final P initial Pfinal  
12     1 2 3 4 5                
13   ML1                          
14   ML2                          
15                              
16                              
17                              
18 Pressurized to 3 Bar Levin August, 2005                        
19                              
20 Overnight dP/dt Measurement Levin 16-八月-06                        
21                              
22     Duration (hr) ∆P (psi) ∆P (mbar) dP/dt (mbar/day)                
23   ML1 15   -27mb                    
24   ML2 15   -13mb                    
25                              
26     (change in P due to temperature: -20mb)                  
27                              
28 Gas Flush Levin August, 2005                        
29                              
30   flow rate (sl/m)                          
31   start date, time                          
32   end date, time                          
33 total volume flowed (sl)                          
34 number of volume exchanges                          
35                              
36                              
37 Inspect HV Connections                            
38 Attatch Sector to CAEN Supply                            
39 Power-Up to 3080 Levin 30-九月-05                        
40   (μA) 1 2 3 4 5                
41   ML1                          
42   ML2                          
43                              
44                              
45                              
46 Short DAQ Test                            
47                              
48                              
49                              
50 3400V 1/2 Hour Levin 30-九月-05                        
51   (μA) 1 2 3 4 5                
52   ML1                          
53   ML2                          
54                              
55                              
56                              
57 3200V 3 Hours Levin 30-九月-05                        
58   (μA) 1 2 3 4 5                
59   ML1                          
60   ML2                          
61                              
62                              
63                              
64 3080V > 1 Day Levin 30-九月-05                        
65   (μA) 1 2 3 4 5                
66   ML1 <0.1 <0.1 <0.1 <0.1 <0.1                
67   ML2 <0.1 <0.1 <0.1 <0.1 <0.1                
68                              
69                              
70                              
71 Start Long-Term DAQ                            
72                              
73 Long-Term Pressure Measurement     START     END                
74     initials date P (psi) initials date P (psi)              
75   ML1                          
76   ML2                          
77                              
78   number of days                          
79 pressure change (psi)                          
80 pressure change (mbar)                          
81   rate (mbar/day)                          
82                              
83                              
84                              
85                              
86 Original Tension Measurement Thun 19-八月-05                        
87   (μm) 1 2 3 4 5                
88   ML1 5 3 237 375 733                
89   ML2 5 3 237 375 733                
90                              
91                              
92                              
93 Tension Stability Check                            
94   (μm) 1 2 3 4 5                
95   ML1                          
96   ML2                          
97                              
98                              
99                              
100 Tension Freshly Tuned Values Thun 8-十二月-05                        
101   (μm) 1 2 3 4 5                
102   ML1 -11 -6 3 -5 28                
103   ML2 2 6 -5 3 -44                
104                              
105                              
106                              
107 Tension Second Stability Check Thun 23-一月-06                        
108   (μm) 1 2 3 4 5                
109   ML1 -12 -6 3 -5 16                
110   ML2 24 14 11 27 8                

Back to top


  A B C D E F G H
1                  
2                  
3 Newer BVBs Installed NOT DONE ("top" two)            
4 Flow Restrictors Installed                
5 Reducers & Master Shutoff Valves Installed hertel 22-二月-06            
6 Connected to Leak Test Station & Gas Supply hertel 22-二月-06            
7 Tightness of BVB Valves Inspected hertel 22-二月-06            
8                  
9 Chamber Pressure Measurement hertel 22-二月-06            
10                  
11                  
12     1 2 3 4 5    
13   ML1 30.75 14.01 38.4 38.43 39.09    
14   ML2 28.87 36.91 38.24 34.98 40.52    
15                  
16                  
17                  
18 Pressurized to 3 Bar hertel 24-二月-06            
19                  
20 Overnight dP/dt Measurement hertel 23-二月-06            
21                  
22     Duration (hr) ∆P (psi) ∆P (mbar) dP/dt (mbar/day)    
23   ML1 23     good      
24   ML2 23     good      
25                  
26     (the numerical results were lost in a computer freeze, but visual inspection of the graph confirmed that there was no significant leakage.)
27                  
28 Gas Flush hertel 24-二月-06            
29                  
30 flow rate (sl/m) 8.6            
31 start date, time Feb 24, 21:00            
32 end date, time Feb 27, 13:15            
33 total volume flowed (sl) 34000            
34 number of volume exchanges ~2.6            
35                  
36                  
37 Inspect HV Connections hertel 27-二月-06            
38 Attatch Sector to CAEN Supply hertel 27-二月-06            
39 Power-Up to 3080 hertel 27-二月-06            
40   (μA) 1 2 3 4 5    
41   ML1 Good Good Good Good Good    
42   ML2 Good Good Good Good Good    
43                  
44                  
45                  
46 Short DAQ Test                
47                  
48                  
49                  
50 3400V 1/2 Hour hertel 28-二月-06            
51   (μA) 1 2 3 4 5    
52   ML1 0.5 0.4 0.2 0 0.4    
53   ML2 0.1 0.1 0.7 0 0.2    
54                  
55                  
56                  
57 3200V 3 Hours hertel 28-二月-06            
58   (μA) 1 2 3 4 5    
59   ML1 0.4 0.3 0 0 0.2    
60   ML2 0 0.1 0.5 0 0.1    
61                  
62                  
63                  
64 3080V > 1 Day hertel 28-二月-06            
65   (μA) 1 2 3 4 5    
66   ML1              
67   ML2              
68                  
69                  
70                  
71 Start Long-Term DAQ                
72                  
73 Long-Term Pressure Measurement     START     END    
74     initials date P (psi) initials date P (psi)  
75   ML1 Hertel 8-三月 45.64        
76   ML2     44.64        
77                  
78 number of days              
79 pressure change (psi)              
80 pressure change (mbar)              
81 rate (mbar/day)              
82                  
83     initial temperature: 13.55 C        
84                  
85                  
86 Original Tension Measurement Thun 16-一月-06            
87   (μm) 1 2 3 4 5    
88   ML1 -21 -23 148 76 138    
89   ML2 71 -9 260 190 116    
90                  
91                  
92                  
93 Tension Stability Check                
94   (μm) 1 2 3 4 5    
95   ML1              
96   ML2              
97                  
98                  
99                  
100 Tension Freshly Tuned Values                
101   (μm) 1 2 3 4 5    
102   ML1              
103   ML2              
104                  
105     (Tuning was done)          
106                  
107 Tension Second Stability Check Thun Jan, 2006            
108   (μm) 1 2 3 4 5    
109   ML1 -21 -24 25 20 -5    
110   ML2 71 -8 9 -4 -17    

Back to top


  A B C D E F G H
1                  
2                  
3 Newer BVBs Installed hertel 7-三月-06            
4 Flow Restrictors Installed hertel 7-三月-06            
5 Reducers & Master Shutoff Valves Installed hertel 9-三月-06            
6 Connected to Leak Test Station & Gas Supply hertel 9-三月-06            
7 Tightness of BVB Valves Inspected hertel 9-三月-06            
8                  
9 Chamber Pressure Measurement hertel 9-三月-06            
10                  
11                  
12     1 2 3 4 5    
13   ML1 33.91 32.33 39.57 38.05 40.1    
14   ML2 34.58 33.6 39.04 39.96 40.33    
15                  
16                  
17                  
18 Pressurized to 3 Bar hertel 9-三月-06            
19                  
20 Overnight dP/dt Measurement hertel 10-三月-06            
21                  
22     Duration (hr) ∆P (psi) ∆P (mbar) dP/dt (mbar/day)    
23   ML1 71 -0.07 -4.8 -1.6      
24   ML2 71 -0.04 -2.8 -0.9      
25                  
26                  
27                  
28 Gas Flush hertel 10-三月-06            
29                  
30 flow rate (sl/m) 8.6            
31 start date, time March 9, 17:00            
32 end date, time March 10, 17:30            
33 total volume flowed (sl)              
34 number of volume exchanges ~1            
35                  
36                  
37 Inspect HV Connections Levin 16-三月-06            
38 Attatch Sector to CAEN Supply Levin 16-三月-06            
39 Power-Up to 3080 Levin 16-三月-06            
40   (μA) 1 2 3 4 5    
41   ML1 0.4 0.3 0.1 0 0.1    
42   ML2 0 0.1 0.5 0 0    
43                  
44   (humidity: 29%)            
45                  
46 Short DAQ Test software issue, test put off for later          
47                  
48                  
49                  
50 3400V 1/2 Hour Levin 16-三月-06            
51   (μA) 1 2 3 4 5    
52   ML1 0.8 0.5 0.2 0 0.3    
53   ML2 0.1 0.4 0.4 0 0.2    
54                  
55     EML3, ML2, layer 2, box 5, tube 3 tripped during this test.    
56                  
57 3200V 3 Hours                
58   (μA) 1 2 3 4 5    
59   ML1              
60   ML2              
61                  
62     not done            
63                  
64 3080V > 1 Day Levin 17-三月-06            
65   (μA) 1 2 3 4 5    
66   ML1 0.5 0.3 0.1 0 0.3    
67   ML2 0.1 0.1 0.4 0 0.1    
68                  
69                  
70                  
71 Start Long-Term DAQ                
72                  
73 Long-Term Pressure Measurement     START     END    
74     initials date P (psi) initials date P (psi)  
75   ML1 Hertel 29-三月 45.61        
76   ML2     44.21        
77                  
78 number of days              
79 pressure change (psi)              
80 pressure change (mbar)              
81 rate (mbar/day)              
82                  
83     (start temperature: 17.56 C)          
84                  
85                  
86 Original Tension Measurement                
87   (μm) 1 2 3 4 5    
88   ML1              
89   ML2              
90                  
91                  
92                  
93 Tension Stability Check                
94   (μm) 1 2 3 4 5    
95   ML1              
96   ML2              
97                  
98                  
99                  
100 Tension Freshly Tuned Values                
101   (μm) 1 2 3 4 5    
102   ML1              
103   ML2              
104                  
105                  
106                  
107 Tension Second Stability Check                
108   (μm) 1 2 3 4 5    
109   ML1              
110   ML2              

Back to top


  A B C D E F G H
1                  
2                  
3 Newer BVBs Installed hertel 29-三月-06            
4 Flow Restrictors Installed hertel 29-三月-06            
5 Reducers & Master Shutoff Valves Installed hertel 29-三月-06            
6 Connected to Leak Test Station & Gas Supply hertel 29-三月-06            
7 Tightness of BVB Valves Inspected hertel 29-三月-06            
8                  
9 Chamber Pressure Measurement hertel 29-三月-06            
10                  
11                  
12   (psi) 1 2 3 4 5    
13   ML1 36.45 39.69 40.85 39.32 40.99    
14   ML2 35.07 36.05 40.25 39.15 41.5    
15                  
16                  
17                  
18 Pressurized to 3 Bar hertel 29-三月-06            
19                  
20 Overnight dP/dt Measurement hertel 31-三月-06            
21                  
22     Duration (hr) ∆P (psi) ∆P (mbar) dP/dt (mbar/day)    
23   ML1 59 -0.22 -15.2 -6.18      
24   ML2 59 -0.17 -11.7 -4.76      
25                  
26     (change in temperature: -1.1 C)        
27                  
28 Gas Flush hertel 29-三月-06            
29                  
30 flow rate (sl/m) 9            
31 start date, time March 29, 15:15            
32 end date, time March 31, 14:00            
33 total volume flowed (sl) 25110            
34 number of volume exchanges 1.93            
35                  
36                  
37 Inspect HV Connections hertel 31-三月-06            
38 Attatch Sector to CAEN Supply hertel 31-三月-06            
39 Power-Up to 3080 hertel 31-三月-06            
40   (μA) 1 2 3 4 5    
41   ML1 0.4 0.3 0 0 0.2    
42   ML2 0.1 0.1 0.4 0 0    
43                  
44                  
45                  
46 Short DAQ Test hertel 31-三月-06            
47                  
48                  
49                  
50 3400V 1/2 Hour                
51   (μA) 1 2 3 4 5    
52   ML1              
53   ML2              
54                  
55     not done            
56                  
57 3200V 3 Hours hertel 31-三月-06            
58   (μA) 1 2 3 4 5    
59   ML1 0.3 0.3 0.1 0 0.2    
60   ML2 0.1 0.1 0.4 0 0.1    
61                  
62                  
63                  
64 3080V > 1 Day                
65   (μA) 1 2 3 4 5    
66   ML1              
67   ML2              
68                  
69                  
70                  
71 Start Long-Term DAQ hertel 31-三月-06            
72                  
73