1. Task A: ATLAS
  2. LHC & ATLAS Schedule
  3. Phase II: Surface Assembly of BW & SW
  4. Phase III: Installation of BW/SW in Pit
  5. UM ATLAS Project Tasks
  6. Remarks on FY2004 UM ATLAS Project
  7. Atlas Hall Status
  8. Slide 9
  9. Slide 10
  10. Movie: UM ATLAS Activities at CERN
  11. ATLAS Muon Project Phase I Chamber Integration and Test
  12. Pilot Work at Ann Arbor
  13. The UM Activities Moved to CERN in 2004
  14. Infrastructure in CERN Building 184
  15. Task and Major Procedures
  16. What does it mean to integrate and test one MDT chamber?
  17. Chamber Integration and Test (CIT) Status In Building 184
  18. Slide 19
  19. Slide 20
  20. Slide 21
  21. Slide 22
  22. Slide 23
  23. Slide 24
  24. Summary
  25. ATLAS Production and Commissioning Databases Development and Maintenance
  26. Database Software
  27. UM ATLAS Database System
  28. US ATLAS Phase I Commissioning Info
  29. Commissioning DB on Web
  30. Ongoing and Future
  31. Slide 33
  32. Slide 34
  33. Slide 35
  34. Slide 36
  35. Slide 37
  36. Slide 38
  37. Slide 39
  38. End Cap Chamber Sagitta vs Alignment
  39. Slide 41
  40. Slide 42
  41. Slide 43
  42. Slide 44
  43. Slide 45
  44. Slide 46
  45. MDT Electronics, X5, & H8 Work by UoM
  46. Leading Issues Ahead
  47. Focus of Individuals
  48. MDT-R/O Architecture
  49. The UoM Device, CSM
  50. Motherboard Status
  51. AMT Fault in Pair Mode
  52. Fault in Pair Mode (Cont.)
  53. Life without Pair Mode
  54. Avoiding Overruns at 80MHz
  55. Previous Work
  56. X5 Tests (Setup)
  57. X5 Tests (Spectrum)
  58. X5 Tests (m or g)
  59. X5 Tests (Efficiency)
  60. X5 Tests (Autocalibration)
  61. X5 Tests (Time Walk)
  62. Radiation Sensitivity Tests
  63. Radiation Test Equipment
  64. Total Ionizing Dose
  65. SEU Observations
  66. SEU Expectations
  67. CSM production
  68. Phases of Commissioning
  69. Commissioning Phase I
  70. Mobile Electronics Test Cart
  71. Electronics Tests
  72. Electronics Requirements
  73. Phase II Operation Details
  74. Dictionary
  75. Dictionary (continued)
  76. UM ATLAS Computing and Analysis Activities: 2003/2004
  77. University of Michigan Activities in ATLAS Computing and Analysis
  78. Highlights
  79. Muon Software Development
  80. Muon Software Coordination
  81. Muon Software Coordination
  82. Chamber Certification Software
  83. Slide 85
  84. Michigan Network and Grid Efforts in Support of ATLAS
  85. Network/Grid Related Activities at UM
  86. Network Leadership
  87. Proposals to Support our Efforts
  88. ATLAS Multi-Grid Production for DC2
  89. Data Challenge 2 at Michigan
  90. Studies of Hyperon Polarization at the LHC
  91. Λb Polarization Studies
  92. Slide 94
  93. Slide 95
  94. First Implementation of EvtGen Package in ATLAS with Polarization
  95. EvtGen Overview
  96. Decay of Polarized Lb in EvtGen
  97. Slide 99
  98. Report on UM ATLAS Collaborative Tool Activities
  99. Scope of Activities
  100. Recordings of ATLAS Events and Development of Web Capture Technology
  101. Ann Arbor – Geneva
  102. UMATLAS and Tier-2 Planning
  103. Intent to Compete for Tier-2 Status
  104. Summary of UM ATLAS Project
  105. Summary of UM ATLAS Project (2)
  106. Slide 108
  107. ATLAS Computing Timeline
  108. Major UM ATLAS Tasks in FY2005
  109. Transition from Construction to M&O
  110. Motivation for Funding Request

Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top


Back to top