1. ATLAS at Michigan
  2. Outline
  3. ATLAS Challenges
  4. The Problem
  5. The Solution
  6. ATLAS
  7. Aims of the Experiment
  8. ATLAS Computing Challenge
  9. (Not to be confused with Great Expectations!)
  10. LHC Schedule
  11. ATLAS Parameters
  12. Data Flow from ATLAS
  13. The ATLAS Trigger/DAQ System
  14. ATLAS Data
  15. HEP Data Analysis
  16. Analysis
  17. Physics Analysis
  18. Analysis Software System
  19. Michigan Resources…
  20. ATLAS Grid Testbed (US)
  21. USATLAS Data Grid Testbed
  22. Michigan Grid Testbed Layout
  23. UM Grid Machine Details
  24. Our Cluster Summary
  25. Michigan NMI Testbed
  26. MGRID – www.mgrid.umich.edu
  27. MGrid Research Project Partners
  28. MGRID Organization (cont.)
  29. MGRID: Goals
  30. (Done last week)
  31. Goals
  32. Resources for Demo
  33. Future US ATLAS / MGRID Goals
  34. The Tiered Hierarchical Computing Model
  35. ATLAS Context
  36. ATLAS Components
  37. A More Grid-like Model
  38. Features of the Cloud Model
  39. Overall Resources (T?er 1)
  40. Slide 40
  41. US ATLAS Tier 2 Scale
  42. Tier 2 Sizing for US
  43. Systems Tests: Data Challenges
  44. (December 2001 – June 2002)
  45. Data Challenges
  46. ATLAS DC1 Phase I (July-August 2002)
  47. DC1/Phase I Task Flow
  48. ATLAS DC1 Phase II (November 02/March 03)
  49. Summary on DC1
  50. Slide 50
  51. DC2:Scenario & Time scale
  52. DC2 Timescales (cont)
  53. Slide 53
  54. DC2-3-4-…
  55. Issues for Discussion
  56. Minimum “Local” Resources…
  57. Do we want to be a Tier 2?
  58. What Is Needed for US ATLAS Testbed?
  59. What Is Needed for NMI?
  60. What Is Needed for MGRID?
  61. ATLAS DC 2: An Opportunity!
  62. Conclusion

ATLAS at Michigan

Back to top


Outline

Back to top


ATLAS Challenges

Back to top


The Problem

Back to top


The Solution

Back to top


ATLAS

Back to top


Aims of the Experiment

Back to top


ATLAS Computing Challenge

Back to top


(Not to be confused with Great Expectations!)

Back to top


LHC Schedule

Back to top


ATLAS Parameters

Back to top


Data Flow from ATLAS

Back to top


The ATLAS Trigger/DAQ System

Back to top


ATLAS Data

Back to top


HEP Data Analysis

Back to top


Analysis

Back to top


Physics Analysis

Back to top


Analysis Software System

Back to top


Michigan Resources…

Back to top


ATLAS Grid Testbed (US)

Back to top


USATLAS Data Grid Testbed

Back to top


Michigan Grid Testbed Layout

Back to top


UM Grid Machine Details

Back to top


Our Cluster Summary

Back to top


Michigan NMI Testbed

Back to top


MGRID – www.mgrid.umich.edu

Back to top


MGrid Research Project Partners

Back to top


MGRID Organization (cont.)

Back to top


MGRID: Goals

Back to top


(Done last week)

Back to top


Goals

Back to top


Resources for Demo

Back to top


Future US ATLAS / MGRID Goals

Back to top


The Tiered Hierarchical Computing Model

Back to top


ATLAS Context

Back to top


ATLAS Components

Back to top


A More Grid-like Model

Back to top


Features of the Cloud Model

Back to top


Overall Resources (T?er 1)

Back to top


Slide 40

Back to top


US ATLAS Tier 2 Scale

Back to top


Tier 2 Sizing for US

Back to top


Systems Tests: Data Challenges

Back to top


(December 2001 – June 2002)

Back to top


Data Challenges

Back to top


ATLAS DC1 Phase I (July-August 2002)

Back to top


DC1/Phase I Task Flow

Back to top


ATLAS DC1 Phase II (November 02/March 03)

Back to top


Summary on DC1

Back to top


Slide 50

Back to top


DC2:Scenario & Time scale

Back to top


DC2 Timescales (cont)

Back to top


Slide 53

Back to top


DC2-3-4-…

Back to top


Issues for Discussion

Back to top


Minimum “Local” Resources…

Back to top


Do we want to be a Tier 2?

Back to top


What Is Needed for US ATLAS Testbed?

Back to top


What Is Needed for NMI?

Back to top


What Is Needed for MGRID?

Back to top


ATLAS DC 2: An Opportunity!

Back to top


Conclusion

Back to top