- ATLAS at Michigan
- Outline
- ATLAS Challenges
- The Problem
- The Solution
- ATLAS
- Aims of the Experiment
- ATLAS Computing Challenge
- (Not to be confused with Great Expectations!)
- LHC Schedule
- ATLAS Parameters
- Data Flow from ATLAS
- The ATLAS Trigger/DAQ System
- ATLAS Data
- HEP Data Analysis
- Analysis
- Physics Analysis
- Analysis Software System
- Michigan Resources
- ATLAS Grid Testbed (US)
- USATLAS Data Grid Testbed
- Michigan Grid Testbed Layout
- UM Grid Machine Details
- Our Cluster Summary
- Michigan NMI Testbed
- MGRID www.mgrid.umich.edu
- MGrid Research Project Partners
- MGRID Organization (cont.)
- MGRID: Goals
- (Done last week)
- Goals
- Resources for Demo
- Future US ATLAS / MGRID Goals
- The Tiered Hierarchical Computing Model
- ATLAS Context
- ATLAS Components
- A More Grid-like Model
- Features of the Cloud Model
- Overall Resources (T?er 1)
- Slide 40
- US ATLAS Tier 2 Scale
- Tier 2 Sizing for US
- Systems Tests: Data Challenges
- (December 2001 June 2002)
- Data Challenges
- ATLAS DC1 Phase I (July-August 2002)
- DC1/Phase I Task Flow
- ATLAS DC1 Phase II (November 02/March 03)
- Summary on DC1
- Slide 50
- DC2:Scenario & Time scale
- DC2 Timescales (cont)
- Slide 53
- DC2-3-4-
- Issues for Discussion
- Minimum Local Resources
- Do we want to be a Tier 2?
- What Is Needed for US ATLAS Testbed?
- What Is Needed for NMI?
- What Is Needed for MGRID?
- ATLAS DC 2: An Opportunity!
- Conclusion
ATLAS at Michigan
Back to top
Outline
Back to top
ATLAS Challenges
Back to top
The Problem
Back to top
The Solution
Back to top
ATLAS
Back to top
Aims of the Experiment
Back to top
ATLAS Computing Challenge
Back to top
(Not to be confused with Great Expectations!)
Back to top
LHC Schedule
Back to top
ATLAS Parameters
Back to top
Data Flow from ATLAS
Back to top
The ATLAS Trigger/DAQ System
Back to top
ATLAS Data
Back to top
HEP Data Analysis
Back to top
Analysis
Back to top
Physics Analysis
Back to top
Analysis Software System
Back to top
Michigan Resources
Back to top
ATLAS Grid Testbed (US)
Back to top
USATLAS Data Grid Testbed
Back to top
Michigan Grid Testbed Layout
Back to top
UM Grid Machine Details
Back to top
Our Cluster Summary
Back to top
Michigan NMI Testbed
Back to top
MGRID www.mgrid.umich.edu
Back to top
MGrid Research Project Partners
Back to top
MGRID Organization (cont.)
Back to top
MGRID: Goals
Back to top
(Done last week)
Back to top
Goals
Back to top
Resources for Demo
Back to top
Future US ATLAS / MGRID Goals
Back to top
The Tiered Hierarchical Computing Model
Back to top
ATLAS Context
Back to top
ATLAS Components
Back to top
A More Grid-like Model
Back to top
Features of the Cloud Model
Back to top
Overall Resources (T?er 1)
Back to top
Slide 40
Back to top
US ATLAS Tier 2 Scale
Back to top
Tier 2 Sizing for US
Back to top
Systems Tests: Data Challenges
Back to top
(December 2001 June 2002)
Back to top
Data Challenges
Back to top
ATLAS DC1 Phase I (July-August 2002)
Back to top
DC1/Phase I Task Flow
Back to top
ATLAS DC1 Phase II (November 02/March 03)
Back to top
Summary on DC1
Back to top
Slide 50
Back to top
DC2:Scenario & Time scale
Back to top
DC2 Timescales (cont)
Back to top
Slide 53
Back to top
DC2-3-4-
Back to top
Issues for Discussion
Back to top
Minimum Local Resources
Back to top
Do we want to be a Tier 2?
Back to top
What Is Needed for US ATLAS Testbed?
Back to top
What Is Needed for NMI?
Back to top
What Is Needed for MGRID?
Back to top
ATLAS DC 2: An Opportunity!
Back to top
Conclusion
Back to top