1. Task A: ATLAS
  2. The ATLAS Detector
  3. UM ATLAS Project
  4. Slide 4
  5. US ATLAS MDT Task Scope & Status
  6. Slide 6
  7. Slide 7
  8. MDT Construction End-Game Schedule
  9. Chamber Integration and Test Lab at CERN Building 184
  10. Working Steps of Chamber Integration and Test
  11. Chamber Final Tests & DB
  12. Slide 12

Task A: ATLAS

Back to top


The ATLAS Detector

Back to top


UM ATLAS Project

Back to top


Slide 4

Back to top


US ATLAS MDT Task Scope & Status

Back to top


Slide 6

Back to top


Slide 7

Back to top


MDT Construction End-Game Schedule

Back to top


Chamber Integration and Test Lab at CERN Building 184

Back to top


Working Steps of Chamber Integration and Test

Back to top


Chamber Final Tests & DB

Back to top


Slide 12

Back to top