- Task A: ATLAS
- The ATLAS Detector
- UM ATLAS Project
- Slide 4
- US ATLAS MDT Task Scope & Status
- Slide 6
- Slide 7
- MDT Construction End-Game Schedule
- Chamber Integration and Test Lab at CERN Building 184
- Working Steps of Chamber Integration and Test
- Chamber Final Tests & DB
- Slide 12
Task A: ATLAS
Back to top
The ATLAS Detector
Back to top
UM ATLAS Project
Back to top
Slide 4
Back to top
US ATLAS MDT Task Scope & Status
Back to top
Slide 6
Back to top
Slide 7
Back to top
MDT Construction End-Game Schedule
Back to top
Chamber Integration and Test Lab at CERN Building 184
Back to top
Working Steps of Chamber Integration and Test
Back to top
Chamber Final Tests & DB
Back to top
Slide 12
Back to top