- Task A: ATLAS
- Slide 2
- Slide 3
- Slide 4
- Slide 5
- Slide 6
- Slide 7
- Slide 8
- Slide 9
- Impact on the momentum resolution due to wire sag
- Unique UM MDT production facility
- Slide 12
- MDT Production Quality Control Database
- Slide 14
- Slide 15
- MDT Chamber Production
- Michigan MDT Tube & Chamber Production
- MDT Tube & Chamber Production
- Michigan MDT Tube Production
- MDT Construction Logistics
- MDT Tube Components
- Michigan MDT Tube Room
- MDT Tube Assembly Fixtures
- MDT Tube Quality Control Fixtures
- MDT Chamber Production
- Chamber Assembly Room
- Chamber Gluing Process
- Spacer Frame Assembly/Gluing
- Chamber Building Quality Control
- Chamber/Tube Handling Fixtures
- Chamber Shipping
- QA/QC and H8 Test
- Slide 33
- Slide 34
- Slide 35
- Slide 36
- Slide 37
- Slide 38
- Slide 39
- Slide 40
- Slide 41
- Slide 42
- Slide 43
- Slide 44
- Efficiency
- Slide 46
- Slide 47
- Slide 48
- Slide 49
- Slide 50
- MDT Electronics at UoM
- 2001 Summary/2002 Plans
- Tests at Michigan
- Octal AMT & ASD Certification
- Goals of the Tests
- Slide 56
- Slide 57
- Slide 58
- Slide 59
- Slide 60
- High Rate Test Difficulties
- Conditions for Hit Miss
- False hits above 20KHz
- Slide 64
- Slide 65
- Conclusions
- CSM Development
- CSM Characteristics
- Motherboard (1/chamber)
- CSM Artwork (1/chamber)
- Goal & Schedule
- UM ATLAS Computing Activities
- ATLAS Computing
- Slide 74
- Slide 75
- Group Computing Contributions to ATLAS Core Computing and Detector Support
- MGRID Project
- Michigan ATLAS Computing Projects
- Slide 79
- Slide 80
- Slide 81
- Slide 82
- Slide 83
- Slide 84
- Slide 85
- Development at UM
- General Strategy
- Production Database: Whats it good for?
- http://atlas.physics.lsa.umich.edu/aspdb/main.asp
- Daily QA/QC Plots
- Monitoring Rejection
- Data Processing Summary
- Data Processing by Station Summary
- Weekly Wiring Production
- Example Drill down: DC Day
- AutoPlot of DC Day Avg Data
- Edit Tables (ORing Inventory)
- Chamber Checklist
- Downloaded Export DB Files
- Rome Copy of UM DB
- Production DB Summary
- Network Leadership
- Network Requirements
- The High Level View
- Existing and Planned Network Efforts
- Achieving High Performance Networking
- Iperf Network Test Setup
- UM Network IPERF Results
- Summary
- Michigan Grid Testbed Layout
- Grid Machine Details
- Grid Related Activities at UM
- Network/Grid Monitoring
- Ganglia
- Authenticated QoS Work
- NMI Overview
- NMI Press Release
- Michigan NMI Testbed
- NMI and US ATLAS
- ATLAS Collaboratory Project
- Initial Activities
- WLAP Server
- Software Development
- GEANT4 Workshop
- How to use CMT in ATLAS
- Introduction to Athena
- Future Directions
- Lecture Object Architecture
- Task Coordination and Development
- ATLAS Muon Database
- Detector Description, Event Model
- Detector Description, Event Model
- Detector Description Development
- Detector Description Development
- Muon Database Clients
- Current and Future Focus
Task A: ATLAS
Back to top
Slide 2
Back to top
Slide 3
Back to top
Slide 4
Back to top
Slide 5
Back to top
Slide 6
Back to top
Slide 7
Back to top
Slide 8
Back to top
Slide 9
Back to top
Impact on the momentum resolution due to wire sag
Back to top
Unique UM MDT production facility
Back to top
Slide 12
Back to top
MDT Production Quality Control Database
Back to top
Slide 14
Back to top
Slide 15
Back to top
MDT Chamber Production
Back to top
Michigan MDT Tube & Chamber Production
Back to top
MDT Tube & Chamber Production
Back to top
Michigan MDT Tube Production
Back to top
MDT Construction Logistics
Back to top
MDT Tube Components
Back to top
Michigan MDT Tube Room
Back to top
MDT Tube Assembly Fixtures
Back to top
MDT Tube Quality Control Fixtures
Back to top
MDT Chamber Production
Back to top
Chamber Assembly Room
Back to top
Chamber Gluing Process
Back to top
Spacer Frame Assembly/Gluing
Back to top
Chamber Building Quality Control
Back to top
Chamber/Tube Handling Fixtures
Back to top
Chamber Shipping
Back to top
QA/QC and H8 Test
Back to top
Slide 33
Back to top
Slide 34
Back to top
Slide 35
Back to top
Slide 36
Back to top
Slide 37
Back to top
Slide 38
Back to top
Slide 39
Back to top
Slide 40
Back to top
Slide 41
Back to top
Slide 42
Back to top
Slide 43
Back to top
Slide 44
Back to top
Efficiency
Back to top
Slide 46
Back to top
Slide 47
Back to top
Slide 48
Back to top
Slide 49
Back to top
Slide 50
Back to top
MDT Electronics at UoM
Back to top
2001 Summary/2002 Plans
Back to top
Tests at Michigan
Back to top
Octal AMT & ASD Certification
Back to top
Goals of the Tests
Back to top
Slide 56
Back to top
Slide 57
Back to top
Slide 58
Back to top
Slide 59
Back to top
Slide 60
Back to top
High Rate Test Difficulties
Back to top
Conditions for Hit Miss
Back to top
False hits above 20KHz
Back to top
Slide 64
Back to top
Slide 65
Back to top
Conclusions
Back to top
CSM Development
Back to top
CSM Characteristics
Back to top
Motherboard (1/chamber)
Back to top
CSM Artwork (1/chamber)
Back to top
Goal & Schedule
Back to top
UM ATLAS Computing Activities
Back to top
ATLAS Computing
Back to top
Slide 74
Back to top
Slide 75
Back to top
Group Computing Contributions to ATLAS Core Computing and Detector Support
Back to top
MGRID Project
Back to top
Michigan ATLAS Computing Projects
Back to top
Slide 79
Back to top
Slide 80
Back to top
Slide 81
Back to top
Slide 82
Back to top
Slide 83
Back to top
Slide 84
Back to top
Slide 85
Back to top
Development at UM
Back to top
General Strategy
Back to top
Production Database: Whats it good for?
Back to top
http://atlas.physics.lsa.umich.edu/aspdb/main.asp
Back to top
Daily QA/QC Plots
Back to top
Monitoring Rejection
Back to top
Data Processing Summary
Back to top
Data Processing by Station Summary
Back to top
Weekly Wiring Production
Back to top
Example Drill down: DC Day
Back to top
AutoPlot of DC Day Avg Data
Back to top
Edit Tables (ORing Inventory)
Back to top
Chamber Checklist
Back to top
Downloaded Export DB Files
Back to top
Rome Copy of UM DB
Back to top
Production DB Summary
Back to top
Network Leadership
Back to top
Network Requirements
Back to top
The High Level View
Back to top
Existing and Planned Network Efforts
Back to top
Achieving High Performance Networking
Back to top
Iperf Network Test Setup
Back to top
UM Network IPERF Results
Back to top
Summary
Back to top
Michigan Grid Testbed Layout
Back to top
Grid Machine Details
Back to top
Grid Related Activities at UM
Back to top
Network/Grid Monitoring
Back to top
Ganglia
Back to top
Authenticated QoS Work
Back to top
NMI Overview
Back to top
NMI Press Release
Back to top
Michigan NMI Testbed
Back to top
NMI and US ATLAS
Back to top
ATLAS Collaboratory Project
Back to top
Initial Activities
Back to top
WLAP Server
Back to top
Software Development
Back to top
GEANT4 Workshop
Back to top
How to use CMT in ATLAS
Back to top
Introduction to Athena
Back to top
Future Directions
Back to top
Lecture Object Architecture
Back to top
Task Coordination and Development
Back to top
ATLAS Muon Database
Back to top
Detector Description, Event Model
Back to top
Detector Description, Event Model
Back to top
Detector Description Development
Back to top
Detector Description Development
Back to top
Muon Database Clients
Back to top
Current and Future Focus
Back to top