1. Task A: ATLAS
  2. Slide 2
  3. Slide 3
  4. Slide 4
  5. Slide 5
  6. Slide 6
  7. Slide 7
  8. Slide 8
  9. Slide 9
  10. Impact on the momentum resolution due to wire sag
  11. Unique UM MDT production facility
  12. Slide 12
  13. MDT Production Quality Control Database
  14. Slide 14
  15. Slide 15
  16. MDT Chamber Production
  17. Michigan MDT Tube & Chamber Production
  18. MDT Tube & Chamber Production
  19. Michigan MDT Tube Production
  20. MDT Construction Logistics
  21. MDT Tube Components
  22. Michigan MDT Tube Room
  23. MDT Tube Assembly Fixtures
  24. MDT Tube Quality Control Fixtures
  25. MDT Chamber Production
  26. Chamber Assembly Room
  27. Chamber Gluing Process
  28. Spacer Frame Assembly/Gluing
  29. Chamber Building Quality Control
  30. Chamber/Tube Handling Fixtures
  31. Chamber Shipping
  32. QA/QC and H8 Test
  33. Slide 33
  34. Slide 34
  35. Slide 35
  36. Slide 36
  37. Slide 37
  38. Slide 38
  39. Slide 39
  40. Slide 40
  41. Slide 41
  42. Slide 42
  43. Slide 43
  44. Slide 44
  45. Efficiency
  46. Slide 46
  47. Slide 47
  48. Slide 48
  49. Slide 49
  50. Slide 50
  51. MDT Electronics at UoM
  52. 2001 Summary/2002 Plans
  53. Tests at Michigan
  54. Octal AMT & ASD Certification
  55. Goals of the Tests
  56. Slide 56
  57. Slide 57
  58. Slide 58
  59. Slide 59
  60. Slide 60
  61. High Rate Test Difficulties
  62. Conditions for Hit Miss
  63. False hits above 20KHz
  64. Slide 64
  65. Slide 65
  66. Conclusions
  67. CSM Development
  68. CSM Characteristics
  69. Motherboard (1/chamber)
  70. CSM Artwork (1/chamber)
  71. Goal & Schedule
  72. UM ATLAS Computing Activities
  73. ATLAS Computing
  74. Slide 74
  75. Slide 75
  76. Group Computing Contributions to ATLAS Core Computing and Detector Support
  77. MGRID Project
  78. Michigan ATLAS Computing Projects
  79. Slide 79
  80. Slide 80
  81. Slide 81
  82. Slide 82
  83. Slide 83
  84. Slide 84
  85. Slide 85
  86. Development at UM
  87. General Strategy
  88. Production Database: What’s it good for?
  89. http://atlas.physics.lsa.umich.edu/aspdb/main.asp
  90. Daily QA/QC Plots
  91. Monitoring Rejection
  92. Data Processing Summary
  93. Data Processing by Station Summary
  94. Weekly Wiring Production
  95. Example “Drill down”: DC Day
  96. AutoPlot of DC Day Avg Data
  97. Edit Tables (ORing Inventory)
  98. Chamber Checklist
  99. Downloaded Export DB Files
  100. Rome “Copy” of UM DB
  101. Production DB Summary
  102. Network Leadership
  103. Network Requirements
  104. The High Level View
  105. Existing and Planned Network Efforts
  106. Achieving High Performance Networking
  107. Iperf Network Test Setup
  108. UM Network IPERF Results
  109. Summary
  110. Michigan Grid Testbed Layout
  111. Grid Machine Details
  112. Grid Related Activities at UM
  113. Network/Grid Monitoring
  114. Ganglia
  115. Authenticated QoS Work
  116. NMI Overview
  117. NMI Press Release
  118. Michigan NMI Testbed
  119. NMI and US ATLAS
  120. ATLAS Collaboratory Project
  121. Initial Activities
  122. WLAP Server
  123. Software Development
  124. GEANT4 Workshop
  125. “How to use CMT in ATLAS”
  126. “Introduction to Athena”
  127. Future Directions
  128. Lecture Object Architecture
  129. Task Coordination and Development
  130. ATLAS Muon Database
  131. Detector Description, Event Model
  132. Detector Description, Event Model
  133. Detector Description Development
  134. Detector Description Development
  135. Muon Database Clients
  136. Current and Future Focus

Task A: ATLAS

Back to top


Slide 2

Back to top


Slide 3

Back to top


Slide 4

Back to top


Slide 5

Back to top


Slide 6

Back to top


Slide 7

Back to top


Slide 8

Back to top


Slide 9

Back to top


Impact on the momentum resolution due to wire sag

Back to top


Unique UM MDT production facility

Back to top


Slide 12

Back to top


MDT Production Quality Control Database

Back to top


Slide 14

Back to top


Slide 15

Back to top


MDT Chamber Production

Back to top


Michigan MDT Tube & Chamber Production

Back to top


MDT Tube & Chamber Production

Back to top


Michigan MDT Tube Production

Back to top


MDT Construction Logistics

Back to top


MDT Tube Components

Back to top


Michigan MDT Tube Room

Back to top


MDT Tube Assembly Fixtures

Back to top


MDT Tube Quality Control Fixtures

Back to top


MDT Chamber Production

Back to top


Chamber Assembly Room

Back to top


Chamber Gluing Process

Back to top


Spacer Frame Assembly/Gluing

Back to top


Chamber Building Quality Control

Back to top


Chamber/Tube Handling Fixtures

Back to top


Chamber Shipping

Back to top


QA/QC and H8 Test

Back to top


Slide 33

Back to top


Slide 34

Back to top


Slide 35

Back to top


Slide 36

Back to top


Slide 37

Back to top


Slide 38

Back to top


Slide 39

Back to top


Slide 40

Back to top


Slide 41

Back to top


Slide 42

Back to top


Slide 43

Back to top


Slide 44

Back to top


Efficiency

Back to top


Slide 46

Back to top


Slide 47

Back to top


Slide 48

Back to top


Slide 49

Back to top


Slide 50

Back to top


MDT Electronics at UoM

Back to top


2001 Summary/2002 Plans

Back to top


Tests at Michigan

Back to top


Octal AMT & ASD Certification

Back to top


Goals of the Tests

Back to top


Slide 56

Back to top


Slide 57

Back to top


Slide 58

Back to top


Slide 59

Back to top


Slide 60

Back to top


High Rate Test Difficulties

Back to top


Conditions for Hit Miss

Back to top


False hits above 20KHz

Back to top


Slide 64

Back to top


Slide 65

Back to top


Conclusions

Back to top


CSM Development

Back to top


CSM Characteristics

Back to top


Motherboard (1/chamber)

Back to top


CSM Artwork (1/chamber)

Back to top


Goal & Schedule

Back to top


UM ATLAS Computing Activities

Back to top


ATLAS Computing

Back to top


Slide 74

Back to top


Slide 75

Back to top


Group Computing Contributions to ATLAS Core Computing and Detector Support

Back to top


MGRID Project

Back to top


Michigan ATLAS Computing Projects

Back to top


Slide 79

Back to top


Slide 80

Back to top


Slide 81

Back to top


Slide 82

Back to top


Slide 83

Back to top


Slide 84

Back to top


Slide 85

Back to top


Development at UM

Back to top


General Strategy

Back to top


Production Database: What’s it good for?

Back to top


http://atlas.physics.lsa.umich.edu/aspdb/main.asp

Back to top


Daily QA/QC Plots

Back to top


Monitoring Rejection

Back to top


Data Processing Summary

Back to top


Data Processing by Station Summary

Back to top


Weekly Wiring Production

Back to top


Example “Drill down”: DC Day

Back to top


AutoPlot of DC Day Avg Data

Back to top


Edit Tables (ORing Inventory)

Back to top


Chamber Checklist

Back to top


Downloaded Export DB Files

Back to top


Rome “Copy” of UM DB

Back to top


Production DB Summary

Back to top


Network Leadership

Back to top


Network Requirements

Back to top


The High Level View

Back to top


Existing and Planned Network Efforts

Back to top


Achieving High Performance Networking

Back to top


Iperf Network Test Setup

Back to top


UM Network IPERF Results

Back to top


Summary

Back to top


Michigan Grid Testbed Layout

Back to top


Grid Machine Details

Back to top


Grid Related Activities at UM

Back to top


Network/Grid Monitoring

Back to top


Ganglia

Back to top


Authenticated QoS Work

Back to top


NMI Overview

Back to top


NMI Press Release

Back to top


Michigan NMI Testbed

Back to top


NMI and US ATLAS

Back to top


ATLAS Collaboratory Project

Back to top


Initial Activities

Back to top


WLAP Server

Back to top


Software Development

Back to top


GEANT4 Workshop

Back to top


“How to use CMT in ATLAS”

Back to top


“Introduction to Athena”

Back to top


Future Directions

Back to top


Lecture Object Architecture

Back to top


Task Coordination and Development

Back to top


ATLAS Muon Database

Back to top


Detector Description, Event Model

Back to top


Detector Description, Event Model

Back to top


Detector Description Development

Back to top


Detector Description Development

Back to top


Muon Database Clients

Back to top


Current and Future Focus

Back to top