Meeting notes for 5/9/01 Atlas Network Proposal Meeting
Shawn, Tom and Abhijit
Tasks for writing pre-proposal for Atlas Networking
-
Define as precisely as possible the following requirements:
-
User requirements for networking
-
Requirements for BW based on dataset sizes and necessary minimum transfer rate
-
Projected requirements a timeline for what requirements need to be met
when
-
Survey existing and on-going work
-
Survey existing work and determine how existing work can fulfill the
requirements and what the gaps are.
-
Survey on-going work in areas pertinent to requirements and determine how
proposed work will fulfill the requirements and what the gaps are.
-
Identify gaps between requirements and existing and ongoing work and the
requirements.
-
Propose work to bridge the gap
-
Spec out time, FTE, etc. required to bridge the gap.
Process:
-
Atlas Network committee needs to be formed (Rob Gardner).
-
Initiate work on item 2 above. (Survey existing and on-going work)
-
May go to Brookhaven, but we would like it to go here
-
If it goes to us, we initiate the work on task 1.
-
Once user requirements are written, we pass it around the Atlas community for
review and sign-off
-
Take the user requirements, and perform tasks 2 through 5 above to produce
network proposal
-
Pass the network proposal document around Atlas community for review and
sign-off
-
Seek Atlas communitys blessing to go forward to funding agencies
-
Send proposal to funding agencies.
Back to top